Free Construction Submittal Log Template

Submittals are where schedules quietly slip. This free log template keeps every submittal, its spec section, status and lead-time-critical date in one view — so long-lead approvals don’t blow your dates.

Download the free template

Free — pick your format.

Free to download and use — or build and share it live in MyBuildTracks, no spreadsheet required.

WHAT TO INCLUDE

What goes on the template

Submittal number

A unique ID per submittal for clean tracking and reference.

Spec section

The CSI spec section, tying each submittal back to the requirement it satisfies.

Description & type

What it is and whether it’s a shop drawing, product data or sample.

Ball-in-court

Who currently owns the next action — the field that prevents finger-pointing.

Date submitted & required

When it went out and the date it must be back to protect procurement/lead time.

Status

Pending / under review / returned, at a glance.

Returned date & disposition

When it came back and the result: approved, approved-as-noted, revise-and-resubmit or rejected.

HOW TO USE IT

Fill it out right

  1. 1

    Log every submittal the moment it’s required — build the log from the spec, not after the fact.

  2. 2

    Flag long-lead items and work backward from when material must be on site.

  3. 3

    Keep ball-in-court current so it’s always clear who’s holding the item.

  4. 4

    Chase items approaching their required-by date before they become a delay.

  5. 5

    Record the disposition so revise-and-resubmit items don’t disappear.

AVOID THESE

Common mistakes

  • Not tracking lead times, so a slow approval quietly delays delivery.
  • No ball-in-court, so stalled items have no owner.
  • Letting revise-and-resubmit items fall off the log.
  • No link back to the spec section that required the submittal.

Track submittals and approvals without the spreadsheet

MyBuildTracks keeps submittals, ball-in-court, status and dates in one place, with guarded status transitions and overdue flags — so long-lead approvals never blindside your schedule. Free for your first two projects.

TEMPLATE FAQ

Questions, answered

What to include, how to use it, and the mistakes to avoid.

A submittal log is the master tracker of every submittal on a project — shop drawings, product data and samples — with its spec section, status, responsible party and key dates.

It’s who currently owns the next action on an item — the contractor, the reviewer, or a sub. Tracking it makes stalled submittals obvious and prevents disputes over who’s holding things up.

Submittal approvals gate procurement. A long-lead item approved late means material arrives late and the schedule slips — often silently. The log surfaces that risk early.

Ready to transform your project delivery?

Join hundreds of construction teams who have streamlined their workflows with MyBuildTracks. Get started in under 5 minutes.

Email us
support@mybuildtracks.com

Send us a message

We typically respond within 24 hours.