Free Construction RFI Template

A good RFI gets answered fast and creates a clean paper trail. This free template gives you a request-for-information form with every field a designer needs to respond without a follow-up.

Download the free template

Free — pick your format.

Free to download and use — or build and share it live in MyBuildTracks, no spreadsheet required.

WHAT TO INCLUDE

What goes on the template

RFI number

A sequential ID so nothing gets lost and everyone references the same item.

Project, date & from/to

Who’s asking, who owns the answer (ball-in-court) and when it was raised.

The question

One clear question or clarification — the single most important field.

Drawing / spec reference

The exact sheet, detail or spec section in question, so the reviewer isn’t hunting.

Suggested solution

Your proposed answer — RFIs with a suggestion get approved far faster.

Cost & schedule impact

Whether the answer affects price or the schedule, flagged up front.

Response & date required

Space for the answer and a clear need-by date that drives urgency.

HOW TO USE IT

Fill it out right

  1. 1

    Number RFIs sequentially and keep one running log.

  2. 2

    Ask one question per RFI — bundled questions stall on the hardest one.

  3. 3

    Reference the exact drawing or spec section every time.

  4. 4

    Propose a solution; it’s easier to approve an answer than to author one.

  5. 5

    Set a realistic need-by date and track status until it’s answered.

AVOID THESE

Common mistakes

  • Several unrelated questions in a single RFI, so the whole thing waits on one.
  • No drawing or spec reference, forcing the reviewer to guess the context.
  • No need-by date, so it drifts to the bottom of the pile.
  • Answers that live in email and never make it back to a tracked log.

Track RFIs automatically instead of in email

MyBuildTracks numbers RFIs for you, keeps ball-in-court and due dates visible, and shows exactly which ones are overdue — so answers stop getting lost. Free for your first two projects.

TEMPLATE FAQ

Questions, answered

What to include, how to use it, and the mistakes to avoid.

A Request for Information is a formal question from the contractor to the design team to clarify drawings, specs or conditions before work proceeds. It creates a documented answer everyone can rely on.

An RFI number, project and date, who’s asking and who owns the answer, one clear question, the drawing or spec reference, a suggested solution, any cost/schedule impact and a need-by date. The template has all of these.

One question per RFI, always reference the drawing, propose an answer, set a need-by date, and track status in a single log rather than in email threads.

Usually the architect or engineer of record. The "ball-in-court" field on the template makes it explicit who currently owns the answer at any moment.

Ready to transform your project delivery?

Join hundreds of construction teams who have streamlined their workflows with MyBuildTracks. Get started in under 5 minutes.

Email us
support@mybuildtracks.com

Send us a message

We typically respond within 24 hours.