WHAT TO INCLUDE

What goes on the template

Item number

A unique ID for every deficiency so it can be assigned and tracked to closure.

Location / room

Exactly where the item is — vague locations are the #1 reason punch items get missed.

Description

A specific description of the deficiency and what "done" looks like.

Trade responsible

Who owns the fix, so items route to the right sub automatically.

Priority

Severity, so life-safety and blocking items get done first.

Photo

A photo removes all ambiguity about the item and the fix.

Status & dates

Open / in progress / done, with date identified and date closed.

Sign-off

Who verified the fix — the field that actually closes the job.

HOW TO USE IT

Fill it out right

  1. 1

    Walk the site room by room so nothing is skipped.

  2. 2

    Write specific, photographable descriptions — not "touch up paint," but "scuff, north wall by door."

  3. 3

    Assign each item to the responsible trade immediately.

  4. 4

    Track every item to a verified, signed-off closure — not just "sub says done."

  5. 5

    Re-walk to confirm before you call the list complete.

AVOID THESE

Common mistakes

  • Descriptions too vague to act on or verify.
  • No photos, so the sub and the super argue about what the item was.
  • No trade assignment, so items sit unowned.
  • Marking items done without a verification/sign-off step.

Pin punch items to the exact spot on the drawing

MyBuildTracks lets you drop a photo punch item onto the drawing where the issue is, assign the trade, and track it to signed-off closure — no lost items, no arguments. Free for your first two projects.

TEMPLATE FAQ

Questions, answered

What to include, how to use it, and the mistakes to avoid.

A punch list is the list of remaining deficiencies and unfinished items found near the end of a project that must be corrected before final completion and payment.

Each item needs a unique number, a specific location, a clear description, the responsible trade, a priority, ideally a photo, and a status through to verified sign-off. The template covers all of these.

Typically the general contractor, architect and/or owner during a walkthrough. Subs then correct their assigned items, and the items are verified before closeout.

When every item has been corrected and verified with a sign-off — not just when a sub reports it done. That verification step is what protects final payment and warranty.

Ready to transform your project delivery?

Join hundreds of construction teams who have streamlined their workflows with MyBuildTracks. Get started in under 5 minutes.

Email us
support@mybuildtracks.com

Send us a message

We typically respond within 24 hours.